Our Experience

Experience

Our Work Experience

Experts in oil, gas, and energy.

2023-To date

Providing Engineering Consultancy Service to Enegro Company Limited on the development of the CNG mother station and daughter station

March 2025 -June 2025

Feasibility study for petroleum depot construction and supply of the refined Products- Zanzibar Petroleum Development Company (ZPDC)

2023

Installation of 300 Litres lactic Tanks – TBL, Arusha Factory. The assignment included engineering design, material procurement, fabrication, installation, testing and commissioning of the lactic tank for brewery application .

2022

Internal Natural Gas Connection – TBL Cooking Facility. The assignment included engineering design, material procurement, construction, installation, testing and commissioning of the natural gas infrastructure within the factory premises including modification of the cooking facility changing from LPG use to Natural gas Use

Sept 2023- June 2024

Internal Natural Gas Connection – Chemi & Cortex Factory. The assignment included project structuring, permit acquisition, engineering design, material procurement, construction, installation, testing and commissioning of the internal natural gas infrastructure within the factory premises.

May 2025 To Sept 2025

Consultancy service for the developmwnt of the CNG mother and daughter stations for Blue flame Tanzania Energy Co ltd.

May 2024 To date

Feasibility study, Engineering Design, permit application, Support GSA negotiation and ESIA Study for development of CNG project for SHTL company.

Image

2022

Internal Natural Gas Connection – TPPL Factory

The assignment included engineering design, material procurement, construction, installation, testing and commissioning of the natural gas infrastructure within the factory premises.

2020

Internal Natural Gas Connection – Bakhresa Factory The assignment included engineering design, material procurement, construction, installation, testing and commissioning of the natural gas infrastructure within the factory premises

June 2025

Design, Installation and undertaking of pipe works for the new burner skids in main burner and calciner for TWIGA CEMENT (Heidelberg Materials)

Contact Us

Terra Oil & Gas Company Ltd
P O Box 8614
Biashara Complex, 1st floor Plot No. 50, Block 29,
Mwananyamala Street,
Dar es Salaam
Email: dernest@terraoilgas.com, info@terraoilgas.com

Phone: +255 717 072 001   

           +255 712 144 802 

Opening Hours

  • Monday: 8.30am–6.30pm
  • Tuesday: 10.00am–8.00pm
  • Wednesday: 8.30am–6.30pm
  • Thursday: 8.30am–7.00pm
  • Friday: 8.30am–3.00pm
  • Saturday: 8.30am–2.00pm
  • Sunday: Closed